NOU BARRIS DISTRICT


Eigentümer MalmoRadek


Typ Mosaik
24 / 7
Status 100% Online
Letzte Überprüfung 25/08/2019

Missionen 18
Gesamtlänge 8.04km
EFF 5.8
Gesamtzeit
Zu Fuß 2St. 53m / 09m 37s Ø
Per Fahrrad 1St. 26m / 04m 47s Ø

Portale 111  /  6.17 Ø
Unique Portale 106
Distanz Start / Endportal: 918 m

Hacks 109
Capture 1
Wegpunkt 1


Fortbewegungsmittel
Zu Fuß (100%)
Per Fahrrad (100%)
Auto (0%)
Mosaik
Barrierefreiheit
Anstrengung
Wegführung

Nächstliegende Mosaike:
- #IngressFS Sant Andreu 2...0.97 km
- Sant Andreu de Palomar0.97 km
- Fénix resurge blanco2.27 km

Beschreibung

The name refers to the original nine neighbourhoods it was composed of, even though nowadays it's made up of fourteen. It covers up an extension of 8,04 km².

lennok

17-11-2018 23:55

i did this mission because of the picture and because its not 'the usual' area of bcn.

not sure if that was a good idea doing a mission with no review and not checking the route carefully in advance on the map. so had to mark it non 24/7.

first mission crossing large street two times has not been well planned. same happend also with the last mission.
in general the portals are not always in an expected line, sometimes (new) portals you pass which are not included, but sometimes you have to go back because they will be later.

had to stop on mission 3 which includes portals of cementario de sant andreu which is closed at night and opens 0800 again.

some missions start with the last portal of the previous mission, so you should keep a mod slot free for a heat sink (happens twice).
mission 15 wasnt easy because there are custruction works currently, but when mission 16 takes the same way back with the portals included in previous mission you'll get capture/upgrade of a portal you might have fully deployed already. as it's annual 4 mods per player time, i was lucky that i had a mod slot free and didnt need to flip it.

it is playable but feels like an early alpha version. with serious review and some fine tuning i guess it won't annoy anymore the agents trying it.
general routing is ok, but needs swapping of some portals or include others than current. doesn't make sense to have portals in line of streets which are parallel and there is no walking through the buildings. so you end up entering a street, walk to the portal and get same way back to main road, just to do same on next crossing again....

i bet it can be done in half the time with some effort in review and resubmitting.